Case transition from Joomla to Solomono

Case transition from Joomla to Solomono

Move the online store of the outdated engine Joomla 1.5.6. on our online platform Solomono.

Project Tasks

transfer of goods: Transfer of all goods with the original data.

transfer categories: Transfer all categories (subcategories) with the original data.

Redesigning the url building structure: One of the client’s wishes was to save the url structure from your site.

design: minor improvements on the design and layout.

Duration: 4-5 weeks.

Important: keep the structure, so as not to lose the results of SEO-promotion.

Project work

1. Transfer of goods and categories

Features: A bad editor was used on joomla, which created problems with the tags that were embedded in the article. Also, in most products, links were used to link to the site that needed to be removed.

Solution: Programmatically removed unnecessary tags and links.

Result: 3000 products were transferred.

2. Redesigning the URL Building Structure

Features: In this project, products and categories did not use standard separators like catalog, product.

Solomono link structure: domain/category-name/id-cat.html

Link structure: domain/{link}.html

Solution: The standard system for constructing urls for the client was updated within 3 days.

Result: All url-addresses were identical to those that were originally in the client's project.

3. Design

Features: In connection with the rapid transition, created for the client key changes in the design, which would not affect the speed of development and satisfy the desires of the client.

Solution: A client marketer sketched a layout, we adjusted it to fit our blocks and changed colors.

Result: Implementation of the layout and changes in the design of the project were implemented within a week.

 

4. Result

In addition to the transfer of the project, the client received a lot of buns :)

We were able to:

  1. Significantly increase the speed of the site.
  2. Made minor improvements client at no extra charge.
  3. Carried out a free transfer of the project to the hosting client.

The project was completed on time, for: 5 weeks.

The successful result was achieved thanks to the coordinated work between us and the customer. All problems that arose while working were promptly eliminated. During the development, no critical changes were made.

At the moment, the client continues to work with us to improve the technical and functional aspects of their project on our engine.

 

PREVIOUS Google Analytics for the little ones: important tools - blog solomono.net NEXT The place of social networks in the promotion online store
Comments

Leave a comment